Lymington Pier
51 delay minutes
Most of the delay picked up at Lymington Pier in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | 22 |
| Signals, points and power | - | - | 16% | 3 |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | 28 | 55% | 4% | 2 |
| Network management | 11 | 21% | 17% | 2 |
| The operators' causes | ||||
| Train faults | 3 | 6% | 16% | 7 |
| Traincrew | 8 | 16% | 11% | 2 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | 23 |
| Operator, other | 2 | 3% | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 28 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 9 |
| TG | Driver | 8 |
| MD | Technical failures below the solebar | 3 |
| FW | Late start/yard overtime not explained by Operator | 2 |
| Q1 | Takeback Pumps | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 316 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 242 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 212 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 209 |
| XP | BRIDGE HIT | 204 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 202 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 196 |
| MD | Technical failures below the solebar | 174 |
| IC | Track circuit failure (including no fault found) | 172 |
| TG | Driver | 145 |