Macclesfield
1,846 delay minutes
The biggest share (17%) of the delay picked up at Macclesfield in the four weeks to 9 December 2023 came from other operator causes.
71% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 49 | 3% | 8% | 2 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 300 | 16% | 16% | 11 a day, the most in 5 years | 2 |
| Weather and structures | 158 | 9% | 7% | 6 a day, more than 3 of the other 4 years | 1 |
| Autumn | 172 | 9% | 7% | 6 a day, the least in 5 years | - |
| External | 30 | 2% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 264 | 14% | 17% | 9 a day, the most in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 229 | 12% | 16% | 8 a day, more than 3 of the other 4 years | 3 |
| Traincrew | 175 | 9% | 11% | 6 a day, more than 3 of the other 4 years | 2 |
| Stations | 97 | 5% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 60 | 3% | 5% | 2 a day, more than 2 of the other 4 years | - |
| Operator, other | 314 | 17% | 7% | 11 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 182 |
| TG | Driver | 126 |
| Q3 | NZ Pumps T | 126 |
| TT | Leaf fall Neutral | 108 |
| IH | Power Supply And Distribution System Failure | 102 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 80 |
| IB | Points failure (including no fault found) | 79 |
| JK | Flooding not due to exceptional weather | 64 |
| OU | Delays not Investigated by Network Rail | 62 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 60 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,886 |
| IB | Points failure (including no fault found) | 3,605 |
| TG | Driver | 3,021 |
| MD | Technical failures below the solebar | 2,795 |
| M8 | Technical failures above the Solebar | 2,200 |
| Q3 | NZ Pumps T | 1,826 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,720 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,590 |
| IC | Track circuit failure (including no fault found) | 1,458 |
| TT | Leaf fall Neutral | 1,445 |