Maghull
36 delay minutes
Most of the delay picked up at Maghull in the four weeks to 9 December 2023 came from faulty trains.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | 33 | 92% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | 3 | 8% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 33 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OG | Ice on conductor rail/OHLE | 190 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 101 |
| MD | Technical failures below the solebar | 74 |
| IC | Track circuit failure (including no fault found) | 59 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 57 |
| TH | (Senior) Conductor/Train Manager | 35 |
| XB | Vandalism or theft (including the placing of objects on the line) | 34 |
| M8 | Technical failures above the Solebar | 34 |
| OM | Technical failure associated with a Railhead conditioning train | 31 |
| R7 | Station delays as a result of overcrowding due to planned events (e.g. sports fixtures, concerts) | 24 |