5,299 delay minutes
The biggest share (39%) of the delay picked up at Maidenhead in the four weeks to 9 December 2023 came from track faults.
55% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 2,057 | 39% | 8% | 73 a day, the most in 5 years | 34 |
| Signals, points and power | 1,106 | 21% | 16% | 40 a day, more than 3 of the other 4 years | 12 |
| Weather and structures | 29 | <1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 45 | <1% | 7% | 2 a day, the least in 5 years | - |
| External | 49 | <1% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 782 | 15% | 17% | 28 a day, the most in 5 years | 97 |
| The operators' causes | |||||
| Train faults | 621 | 12% | 16% | 22 a day, more than 3 of the other 4 years | 21 |
| Traincrew | 185 | 3% | 11% | 7 a day, more than 1 of the other 4 years | 3 |
| Stations | 9 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 185 | 3% | 5% | 7 a day, the most in 5 years | 8 |
| Operator, other | 233 | 4% | 7% | 8 a day, the most in 5 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 741 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 661 |
| IB | Points failure (including no fault found) | 631 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 627 |
| OU | Delays not Investigated by Network Rail | 507 |
| IA | Signal failure (including no fault found) | 219 |
| TG | Driver | 167 |
| M7 | Door and Door system faults | 150 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 149 |
| I1 | Overhead line/third rail defect | 115 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 12,974 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,098 |
| TG | Driver | 7,015 |
| J3 | Axle Counter Failure | 6,588 |
| M8 | Technical failures above the Solebar | 3,957 |
| MD | Technical failures below the solebar | 3,759 |
| I1 | Overhead line/third rail defect | 3,687 |
| ZU | No Cause Identified After investigation by both Parties | 3,564 |
| M7 | Door and Door system faults | 3,287 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,097 |