Manchester Piccadilly
18,097 delay minutes
The biggest share (20%) of the delay picked up at Manchester Piccadilly in the four weeks to 9 December 2023 came from faulty trains.
78% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 720 | 4% | 8% | 26 a day, more than 2 of the other 4 years | 7 |
| Signals, points and power | 2,702 | 15% | 16% | 97 a day, the most in 5 years | 34 |
| Weather and structures | 1,302 | 7% | 7% | 47 a day, the most in 5 years | 23 |
| Autumn | 982 | 5% | 7% | 35 a day, the most in 5 years | 1 |
| External | 380 | 2% | 4% | 14 a day, more than 3 of the other 4 years | 4 |
| Network management | 2,859 | 16% | 17% | 102 a day, the most in 5 years | 143 |
| The operators' causes | |||||
| Train faults | 3,672 | 20% | 16% | 131 a day, more than 3 of the other 4 years | 91 |
| Traincrew | 3,039 | 17% | 11% | 109 a day, the most in 5 years | 190 |
| Stations | 490 | 3% | 3% | 17 a day, more than 2 of the other 4 years | 1 |
| Operations | 811 | 4% | 5% | 29 a day, the most in 5 years | 14 |
| Operator, other | 1,141 | 6% | 7% | 41 a day, more than 3 of the other 4 years | 9 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,846 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 953 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 946 |
| TH | (Senior) Conductor/Train Manager | 783 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 720 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 710 |
| OU | Delays not Investigated by Network Rail | 702 |
| IH | Power Supply And Distribution System Failure | 656 |
| M8 | Technical failures above the Solebar | 616 |
| MD | Technical failures below the solebar | 555 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 63,604 |
| MD | Technical failures below the solebar | 33,508 |
| M8 | Technical failures above the Solebar | 23,583 |
| TH | (Senior) Conductor/Train Manager | 19,560 |
| IB | Points failure (including no fault found) | 18,197 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 18,099 |
| M7 | Door and Door system faults | 16,888 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 14,216 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 13,716 |
| MU | Depot operating problem | 13,700 |