Margate
665 delay minutes
The biggest share (28%) of the delay picked up at Margate in the four weeks to 9 December 2023 came from how the network was run.
80% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 4 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 57 | 9% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 45 | 7% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 77 | 12% | 7% | 3 a day, the most in 5 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 183 | 28% | 17% | 7 a day, more than 3 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 66 | 10% | 16% | 2 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 59 | 9% | 11% | 2 a day, more than 2 of the other 4 years | 2 |
| Stations | 33 | 5% | 3% | 1 a day, the most in 5 years | - |
| Operations | 43 | 6% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 95 | 14% | 7% | 3 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 77 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 70 |
| TT | Leaf fall Neutral | 65 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 47 |
| OG | Ice on conductor rail/OHLE | 45 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 43 |
| TG | Driver | 40 |
| IC | Track circuit failure (including no fault found) | 38 |
| TZ | Other Passenger Train Operating Company causes | 35 |
| OB | Delayed by signaller not applying applicable regulating policy | 17 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,584 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,119 |
| XP | BRIDGE HIT | 2,769 |
| TG | Driver | 2,275 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 1,747 |
| I4 | OHLE/third rail power supply failure or reduction | 1,692 |
| J3 | Axle Counter Failure | 1,663 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,348 |
| XB | Vandalism or theft (including the placing of objects on the line) | 1,212 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,102 |