CSV JSON

665 delay minutes

The biggest share (28%) of the delay picked up at Margate in the four weeks to 9 December 2023 came from how the network was run.

80% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track4<1%8% 0 a day, the least in 5 years-
Signals, points and power579%16% 2 a day, more than 1 of the other 4 years-
Weather and structures457%7% 2 a day, more than 3 of the other 4 years-
Autumn7712%7% 3 a day, the most in 5 years-
External3<1%4% 0 a day, the least in 5 years-
Network management18328%17% 7 a day, more than 3 of the other 4 years3
The operators' causes
Train faults6610%16% 2 a day, more than 1 of the other 4 years1
Traincrew599%11% 2 a day, more than 2 of the other 4 years2
Stations335%3% 1 a day, the most in 5 years-
Operations436%5% 2 a day, more than 3 of the other 4 years-
Operator, other9514%7% 3 a day, more than 1 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T77
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)70
TTLeaf fall Neutral65
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)47
OGIce on conductor rail/OHLE45
MNBrake and brake systems faults; including wheel flats where no other cause had been identified43
TGDriver40
ICTrack circuit failure (including no fault found)38
TZOther Passenger Train Operating Company causes35
OBDelayed by signaller not applying applicable regulating policy17
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,584
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,119
XPBRIDGE HIT2,769
TGDriver2,275
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards1,747
I4OHLE/third rail power supply failure or reduction1,692
J3Axle Counter Failure1,663
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)1,348
XBVandalism or theft (including the placing of objects on the line)1,212
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,102