785 delay minutes
The biggest share (26%) of the delay picked up at Matlock in the four weeks to 9 December 2023 came from faulty trains.
85% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 49 | 6% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 74 | 9% | 16% | 3 a day, more than 3 of the other 4 years | - |
| Weather and structures | 129 | 16% | 7% | 5 a day, the most in 5 years | 3 |
| Autumn | 82 | 10% | 7% | 3 a day, the most in 5 years | - |
| External | 10 | 1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 85 | 11% | 17% | 3 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 204 | 26% | 16% | 7 a day, the most in 5 years | 1 |
| Traincrew | 70 | 9% | 11% | 3 a day, the most in 5 years | 1 |
| Stations | 20 | 3% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 18 | 2% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 45 | 6% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JK | Flooding not due to exceptional weather | 94 |
| M7 | Door and Door system faults | 71 |
| QI | Cautioning due to railhead leaf contamination | 48 |
| MU | Depot operating problem | 44 |
| TH | (Senior) Conductor/Train Manager | 43 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 36 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 27 |
| TG | Driver | 27 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 26 |
| M8 | Technical failures above the Solebar | 25 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,527 |
| MD | Technical failures below the solebar | 1,450 |
| M8 | Technical failures above the Solebar | 1,046 |
| M7 | Door and Door system faults | 967 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 626 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 560 |
| Q1 | Takeback Pumps | 560 |
| TH | (Senior) Conductor/Train Manager | 549 |
| RB | Passengers joining/alighting | 532 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 515 |