Leaves on the Line

Matlock

MAT East Midlands route
CSV JSON

785 delay minutes

The biggest share (26%) of the delay picked up at Matlock in the four weeks to 9 December 2023 came from faulty trains.

85% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track496%8% 2 a day, the most in 5 years-
Signals, points and power749%16% 3 a day, more than 3 of the other 4 years-
Weather and structures12916%7% 5 a day, the most in 5 years3
Autumn8210%7% 3 a day, the most in 5 years-
External101%4% 0 a day, more than 1 of the other 4 years-
Network management8511%17% 3 a day, more than 1 of the other 4 years-
The operators' causes
Train faults20426%16% 7 a day, the most in 5 years1
Traincrew709%11% 3 a day, the most in 5 years1
Stations203%3% 1 a day, more than 2 of the other 4 years-
Operations182%5% 1 a day, more than 2 of the other 4 years-
Operator, other456%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
JKFlooding not due to exceptional weather94
M7Door and Door system faults71
QICautioning due to railhead leaf contamination48
MUDepot operating problem44
TH(Senior) Conductor/Train Manager43
OCSignaller including mis-routing (not ERTM /ETCS related)36
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.27
TGDriver27
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail26
M8Technical failures above the Solebar25
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,527
MDTechnical failures below the solebar1,450
M8Technical failures above the Solebar1,046
M7Door and Door system faults967
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.626
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure560
Q1Takeback Pumps560
TH(Senior) Conductor/Train Manager549
RBPassengers joining/alighting532
MNBrake and brake systems faults; including wheel flats where no other cause had been identified515