1,345 delay minutes
The biggest share (20%) of the delay picked up at Middlesbrough in the four weeks to 9 December 2023 came from faulty trains.
73% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 13 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 230 | 17% | 16% | 8 a day, more than 2 of the other 4 years | 5 |
| Weather and structures | 58 | 4% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 30 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 61 | 5% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 185 | 14% | 17% | 7 a day, more than 2 of the other 4 years | 36 |
| The operators' causes | |||||
| Train faults | 275 | 20% | 16% | 10 a day, more than 1 of the other 4 years | 8 |
| Traincrew | 242 | 18% | 11% | 9 a day, more than 3 of the other 4 years | 30 |
| Stations | 90 | 7% | 3% | 3 a day, more than 2 of the other 4 years | - |
| Operations | 126 | 9% | 5% | 4 a day, the most in 5 years | 2 |
| Operator, other | 36 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 172 |
| MD | Technical failures below the solebar | 115 |
| TG | Driver | 106 |
| TH | (Senior) Conductor/Train Manager | 83 |
| OU | Delays not Investigated by Network Rail | 79 |
| RB | Passengers joining/alighting | 61 |
| MC | Diesel Loco failure, defect, attention | 57 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 47 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 43 |
| M7 | Door and Door system faults | 40 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 7,229 |
| MD | Technical failures below the solebar | 3,953 |
| IB | Points failure (including no fault found) | 3,205 |
| TH | (Senior) Conductor/Train Manager | 2,850 |
| M7 | Door and Door system faults | 2,154 |
| MU | Depot operating problem | 2,000 |
| RB | Passengers joining/alighting | 1,940 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,850 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 1,750 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,529 |