Leaves on the Line

Morecambe

MCM North West route
CSV JSON

830 delay minutes

The biggest share (24%) of the delay picked up at Morecambe in the four weeks to 9 December 2023 came from traincrew problems.

99% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track7<1%8% 0 a day, the least in 5 years1
Signals, points and power14618%16% 5 a day, the most in 5 years3
Weather and structures506%7% 2 a day, more than 3 of the other 4 years10
Autumn324%7% 1 a day, more than 2 of the other 4 years-
External101%4% 0 a day, more than 2 of the other 4 years1
Network management8911%17% 3 a day, more than 2 of the other 4 years4
The operators' causes
Train faults13717%16% 5 a day, more than 3 of the other 4 years8
Traincrew19924%11% 7 a day, the most in 5 years52
Stations334%3% 1 a day, more than 3 of the other 4 years-
Operations577%5% 2 a day, more than 3 of the other 4 years-
Operator, other719%7% 3 a day, more than 2 of the other 4 years4

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver117
TH(Senior) Conductor/Train Manager73
IHPower Supply And Distribution System Failure57
IBPoints failure (including no fault found)51
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)38
MDTechnical failures below the solebar26
Q3NZ Pumps T26
OCSignaller including mis-routing (not ERTM /ETCS related)25
TZOther Passenger Train Operating Company causes23
TTLeaf fall Neutral23
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,194
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)2,123
MDTechnical failures below the solebar1,823
IBPoints failure (including no fault found)1,307
ZUNo Cause Identified After investigation by both Parties1,197
TH(Senior) Conductor/Train Manager1,170
IRBroken/cracked/twisted/buckled/flawed rail1,014
IASignal failure (including no fault found)1,007
ICTrack circuit failure (including no fault found)939
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)877