Manchester Oxford Road
4,927 delay minutes
The biggest share (21%) of the delay picked up at Manchester Oxford Road in the four weeks to 9 December 2023 came from traincrew problems.
71% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 169 | 3% | 8% | 6 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 584 | 12% | 16% | 21 a day, more than 2 of the other 4 years | 8 |
| Weather and structures | 525 | 11% | 7% | 19 a day, more than 3 of the other 4 years | 8 |
| Autumn | 232 | 5% | 7% | 8 a day, more than 2 of the other 4 years | - |
| External | 267 | 5% | 4% | 10 a day, more than 3 of the other 4 years | - |
| Network management | 463 | 9% | 17% | 17 a day, more than 2 of the other 4 years | 52 |
| The operators' causes | |||||
| Train faults | 703 | 14% | 16% | 25 a day, more than 1 of the other 4 years | 6 |
| Traincrew | 1,043 | 21% | 11% | 37 a day, more than 2 of the other 4 years | 77 |
| Stations | 178 | 4% | 3% | 6 a day, more than 2 of the other 4 years | - |
| Operations | 481 | 10% | 5% | 17 a day, the most in 5 years | 5 |
| Operator, other | 283 | 6% | 7% | 10 a day, more than 3 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 585 |
| TH | (Senior) Conductor/Train Manager | 363 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 355 |
| TZ | Other Passenger Train Operating Company causes | 236 |
| IB | Points failure (including no fault found) | 201 |
| XP | BRIDGE HIT | 139 |
| OU | Delays not Investigated by Network Rail | 127 |
| QJ | Special working for leaf-fall track circuit operation | 121 |
| M7 | Door and Door system faults | 120 |
| II | Signalling lineside cable fault | 118 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 28,855 |
| MD | Technical failures below the solebar | 13,793 |
| TH | (Senior) Conductor/Train Manager | 9,833 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 7,554 |
| T3 | Waiting connections from other transport modes | 7,479 |
| M8 | Technical failures above the Solebar | 7,412 |
| M7 | Door and Door system faults | 7,279 |
| IB | Points failure (including no fault found) | 5,959 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 5,700 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,747 |