Maidstone East
1,732 delay minutes
The biggest share (23%) of the delay picked up at Maidstone East in the four weeks to 9 December 2023 came from autumn leaves.
51% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 116 | 7% | 8% | 4 a day, the most in 5 years | - |
| Signals, points and power | 372 | 21% | 16% | 13 a day, the most in 5 years | 4 |
| Weather and structures | 18 | 1% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
| Autumn | 406 | 23% | 7% | 15 a day, more than 2 of the other 4 years | 4 |
| External | 54 | 3% | 4% | 2 a day, more than 2 of the other 4 years | - |
| Network management | 302 | 17% | 17% | 11 a day, the most in 5 years | 8 |
| The operators' causes | |||||
| Train faults | 161 | 9% | 16% | 6 a day, more than 3 of the other 4 years | 5 |
| Traincrew | 23 | 1% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 8 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 54 | 3% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 218 | 13% | 7% | 8 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QH | Adhesion problems due to leaf contamination | 236 |
| Q3 | NZ Pumps T | 170 |
| TT | Leaf fall Neutral | 168 |
| IB | Points failure (including no fault found) | 143 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 111 |
| OA | Regulation Decision Made With Best Endeavours | 87 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 84 |
| I5 | Possession over-run from planned work | 49 |
| MY | Coupler, Coupler system and Jumper cable faults | 45 |
| TZ | Other Passenger Train Operating Company causes | 45 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 13,287 |
| TT | Leaf fall Neutral | 4,449 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,281 |
| Q3 | NZ Pumps T | 3,054 |
| TG | Driver | 2,311 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,477 |
| IC | Track circuit failure (including no fault found) | 1,452 |
| IB | Points failure (including no fault found) | 1,390 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,363 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 1,182 |