Leaves on the Line

Maidstone East

MDE Kent route
CSV JSON

1,732 delay minutes

The biggest share (23%) of the delay picked up at Maidstone East in the four weeks to 9 December 2023 came from autumn leaves.

51% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1167%8% 4 a day, the most in 5 years-
Signals, points and power37221%16% 13 a day, the most in 5 years4
Weather and structures181%7% 1 a day, more than 3 of the other 4 years1
Autumn40623%7% 15 a day, more than 2 of the other 4 years4
External543%4% 2 a day, more than 2 of the other 4 years-
Network management30217%17% 11 a day, the most in 5 years8
The operators' causes
Train faults1619%16% 6 a day, more than 3 of the other 4 years5
Traincrew231%11% 1 a day, more than 2 of the other 4 years-
Stations8<1%3% 0 a day, more than 2 of the other 4 years-
Operations543%5% 2 a day, more than 3 of the other 4 years-
Operator, other21813%7% 8 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QHAdhesion problems due to leaf contamination236
Q3NZ Pumps T170
TTLeaf fall Neutral168
IBPoints failure (including no fault found)143
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure111
OARegulation Decision Made With Best Endeavours87
IRBroken/cracked/twisted/buckled/flawed rail84
I5Possession over-run from planned work49
MYCoupler, Coupler system and Jumper cable faults45
TZOther Passenger Train Operating Company causes45
Since 2018
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)13,287
TTLeaf fall Neutral4,449
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,281
Q3NZ Pumps T3,054
TGDriver2,311
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions1,477
ICTrack circuit failure (including no fault found)1,452
IBPoints failure (including no fault found)1,390
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,363
MPRail / wheel interface, adhesion problems (including ice on the running rail)1,182