Leaves on the Line

Maiden Newton

MDN Wessex route
CSV JSON

758 delay minutes

The biggest share (25%) of the delay picked up at Maiden Newton in the four weeks to 9 December 2023 came from autumn leaves.

85% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power7610%16% 3 a day, the most in 5 years-
Weather and structures10914%7% 4 a day, the most in 5 years-
Autumn19125%7% 7 a day, the most in 5 years-
External395%4% 1 a day, the most in 5 years-
Network management12717%17% 5 a day, the most in 5 years-
The operators' causes
Train faults10714%16% 4 a day, the most in 5 years-
Traincrew709%11% 3 a day, the most in 5 years-
Stations122%3% 0 a day, the most in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other284%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QHAdhesion problems due to leaf contamination109
TGDriver67
OBDelayed by signaller not applying applicable regulating policy60
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions58
OEFailure to lay Sandite or operate Railhead Conditioning train as programmed54
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)51
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)39
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure33
MDTechnical failures below the solebar30
Q3NZ Pumps T28
Since 2018
CodeWhat Network Rail loggedMinutes
JHCritical Rail Temperature speeds, (other than buckled rails)1,012
MDTechnical failures below the solebar937
TGDriver818
ZUNo Cause Identified After investigation by both Parties706
IASignal failure (including no fault found)645
M7Door and Door system faults567
M8Technical failures above the Solebar552
RBPassengers joining/alighting358
IBPoints failure (including no fault found)350
I8Animal Strike or Incursion within the control of Network Rail337