Maiden Newton
758 delay minutes
The biggest share (25%) of the delay picked up at Maiden Newton in the four weeks to 9 December 2023 came from autumn leaves.
85% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 76 | 10% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | 109 | 14% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 191 | 25% | 7% | 7 a day, the most in 5 years | - |
| External | 39 | 5% | 4% | 1 a day, the most in 5 years | - |
| Network management | 127 | 17% | 17% | 5 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 107 | 14% | 16% | 4 a day, the most in 5 years | - |
| Traincrew | 70 | 9% | 11% | 3 a day, the most in 5 years | - |
| Stations | 12 | 2% | 3% | 0 a day, the most in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 28 | 4% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QH | Adhesion problems due to leaf contamination | 109 |
| TG | Driver | 67 |
| OB | Delayed by signaller not applying applicable regulating policy | 60 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 58 |
| OE | Failure to lay Sandite or operate Railhead Conditioning train as programmed | 54 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 51 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 39 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 33 |
| MD | Technical failures below the solebar | 30 |
| Q3 | NZ Pumps T | 28 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 1,012 |
| MD | Technical failures below the solebar | 937 |
| TG | Driver | 818 |
| ZU | No Cause Identified After investigation by both Parties | 706 |
| IA | Signal failure (including no fault found) | 645 |
| M7 | Door and Door system faults | 567 |
| M8 | Technical failures above the Solebar | 552 |
| RB | Passengers joining/alighting | 358 |
| IB | Points failure (including no fault found) | 350 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 337 |