Leaves on the Line

Maidstone West

MDW Kent route
CSV JSON

447 delay minutes

The biggest share (33%) of the delay picked up at Maidstone West in the four weeks to 9 December 2023 came from how the network was run.

21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power6314%16% 2 a day, more than 2 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn8519%7% 3 a day, more than 1 of the other 4 years-
External92%4% 0 a day, more than 1 of the other 4 years-
Network management14833%17% 5 a day, the most in 5 years3
The operators' causes
Train faults358%16% 1 a day, more than 3 of the other 4 years-
Traincrew2<1%11% 0 a day, the least in 5 years-
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other10323%7% 4 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T85
TTLeaf fall Neutral83
I6Delays as a result of line blocks / track patrols (including late handback)55
IKTelecom equipment failure (including no fault found)37
OCSignaller including mis-routing (not ERTM /ETCS related)37
I5Possession over-run from planned work33
MNBrake and brake systems faults; including wheel flats where no other cause had been identified20
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure16
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident10
I9Fires starting on Network Rail Infrastructure9
Since 2018
CodeWhat Network Rail loggedMinutes
TTLeaf fall Neutral1,688
Q3NZ Pumps T1,306
ICTrack circuit failure (including no fault found)1,096
OCSignaller including mis-routing (not ERTM /ETCS related)1,056
TGDriver963
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)857
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure767
MPRail / wheel interface, adhesion problems (including ice on the running rail)686
MDTechnical failures below the solebar581
VHPassenger Communication cord, door egress or emergency train alarm operated566