Maidstone West
447 delay minutes
The biggest share (33%) of the delay picked up at Maidstone West in the four weeks to 9 December 2023 came from how the network was run.
21% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 63 | 14% | 16% | 2 a day, more than 2 of the other 4 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 85 | 19% | 7% | 3 a day, more than 1 of the other 4 years | - |
| External | 9 | 2% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 148 | 33% | 17% | 5 a day, the most in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 35 | 8% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Traincrew | 2 | <1% | 11% | 0 a day, the least in 5 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 103 | 23% | 7% | 4 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 85 |
| TT | Leaf fall Neutral | 83 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 55 |
| IK | Telecom equipment failure (including no fault found) | 37 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 37 |
| I5 | Possession over-run from planned work | 33 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 20 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 16 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 10 |
| I9 | Fires starting on Network Rail Infrastructure | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TT | Leaf fall Neutral | 1,688 |
| Q3 | NZ Pumps T | 1,306 |
| IC | Track circuit failure (including no fault found) | 1,096 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,056 |
| TG | Driver | 963 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 857 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 767 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 686 |
| MD | Technical failures below the solebar | 581 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 566 |