Merthyr Tydfil
173 delay minutes
The biggest share (23%) of the delay picked up at Merthyr Tydfil in the four weeks to 9 December 2023 came from faulty trains.
87% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 1 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 11 | 6% | 16% | 0 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 4 | 2% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 22 | 13% | 17% | 1 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 40 | 23% | 16% | 1 a day, the least in 5 years | 7 |
| Traincrew | 33 | 19% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 30 | 17% | 3% | 1 a day, more than 2 of the other 4 years | - |
| Operations | 32 | 18% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TZ | Other Passenger Train Operating Company causes | 32 |
| TG | Driver | 30 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 27 |
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 15 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 12 |
| RB | Passengers joining/alighting | 8 |
| J3 | Axle Counter Failure | 7 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 7 |
| T2 | Delay at unstaffed station to non-DOO train | 7 |
| MD | Technical failures below the solebar | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,153 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 960 |
| T2 | Delay at unstaffed station to non-DOO train | 955 |
| MD | Technical failures below the solebar | 942 |
| OU | Delays not Investigated by Network Rail | 857 |
| TG | Driver | 817 |
| TH | (Senior) Conductor/Train Manager | 645 |
| M8 | Technical failures above the Solebar | 610 |
| IB | Points failure (including no fault found) | 523 |
| M7 | Door and Door system faults | 499 |