The biggest share (41%) of the delay picked up at Market Harborough in the four weeks to 9 December 2023 came from signal, points and power faults.
43% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 37 | 5% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 290 | 41% | 16% | 10 a day, the most in 5 years | - |
| Weather and structures | 45 | 6% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 11 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 179 | 25% | 17% | 6 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 38 | 5% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 35 | 5% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 19 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 11 | 2% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 37 | 5% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 142 |
| IE | Signalling Functional Power Supply Failure | 98 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 89 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 28 |
| TG | Driver | 26 |
| FW | Late start/yard overtime not explained by Operator | 25 |
| M8 | Technical failures above the Solebar | 19 |
| J0 | Telecom equipment radio failure (GSM-R) | 17 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 16 |
| ZU | No Cause Identified After investigation by both Parties | 16 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,994 |
| JA | TSR speed restrictions for track work outside of the Timetable Planning Rules | 1,505 |
| M8 | Technical failures above the Solebar | 1,399 |
| IB | Points failure (including no fault found) | 1,322 |
| MD | Technical failures below the solebar | 1,271 |
| ZU | No Cause Identified After investigation by both Parties | 1,209 |
| IH | Power Supply And Distribution System Failure | 1,191 |
| TG | Driver | 1,174 |
| IC | Track circuit failure (including no fault found) | 1,158 |
| XP | BRIDGE HIT | 989 |