704 delay minutes

The biggest share (41%) of the delay picked up at Market Harborough in the four weeks to 9 December 2023 came from signal, points and power faults.

43% of these minutes were knock-on from something that happened elsewhere first. 79% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track375%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power29041%16% 10 a day, the most in 5 years-
Weather and structures456%7% 2 a day, more than 3 of the other 4 years-
Autumn112%7% 0 a day, more than 2 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management17925%17% 6 a day, more than 2 of the other 4 years-
The operators' causes
Train faults385%16% 1 a day, the least in 5 years-
Traincrew355%11% 1 a day, more than 1 of the other 4 years-
Stations193%3% 1 a day, more than 3 of the other 4 years-
Operations112%5% 0 a day, more than 1 of the other 4 years-
Operator, other375%7% 1 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)142
IESignalling Functional Power Supply Failure98
I8Animal Strike or Incursion within the control of Network Rail89
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail28
TGDriver26
FWLate start/yard overtime not explained by Operator25
M8Technical failures above the Solebar19
J0Telecom equipment radio failure (GSM-R)17
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)16
ZUNo Cause Identified After investigation by both Parties16
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,994
JATSR speed restrictions for track work outside of the Timetable Planning Rules1,505
M8Technical failures above the Solebar1,399
IBPoints failure (including no fault found)1,322
MDTechnical failures below the solebar1,271
ZUNo Cause Identified After investigation by both Parties1,209
IHPower Supply And Distribution System Failure1,191
TGDriver1,174
ICTrack circuit failure (including no fault found)1,158
XPBRIDGE HIT989