Meadowhall
4,903 delay minutes
The biggest share (20%) of the delay picked up at Meadowhall in the four weeks to 9 December 2023 came from how the network was run.
84% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 598 | 12% | 8% | 21 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 294 | 6% | 16% | 11 a day, more than 1 of the other 4 years | - |
| Weather and structures | 308 | 6% | 7% | 11 a day, more than 3 of the other 4 years | - |
| Autumn | 421 | 9% | 7% | 15 a day, more than 2 of the other 4 years | - |
| External | 130 | 3% | 4% | 5 a day, more than 1 of the other 4 years | - |
| Network management | 961 | 20% | 17% | 34 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 592 | 12% | 16% | 21 a day, more than 1 of the other 4 years | - |
| Traincrew | 608 | 12% | 11% | 22 a day, more than 3 of the other 4 years | - |
| Stations | 229 | 5% | 3% | 8 a day, more than 1 of the other 4 years | - |
| Operations | 391 | 8% | 5% | 14 a day, more than 3 of the other 4 years | - |
| Operator, other | 372 | 8% | 7% | 13 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 362 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 359 |
| TG | Driver | 336 |
| Q3 | NZ Pumps T | 217 |
| MD | Technical failures below the solebar | 203 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 202 |
| QJ | Special working for leaf-fall track circuit operation | 189 |
| TT | Leaf fall Neutral | 178 |
| TH | (Senior) Conductor/Train Manager | 156 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 145 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 13,800 |
| MD | Technical failures below the solebar | 12,792 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 8,475 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 8,056 |
| IB | Points failure (including no fault found) | 6,882 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,292 |
| TH | (Senior) Conductor/Train Manager | 5,590 |
| M8 | Technical failures above the Solebar | 5,525 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,996 |
| M7 | Door and Door system faults | 4,774 |