Manchester Airport
4,245 delay minutes
The biggest share (24%) of the delay picked up at Manchester Airport in the four weeks to 9 December 2023 came from faulty trains.
89% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 90 | 2% | 8% | 3 a day, more than 2 of the other 4 years | 1 |
| Signals, points and power | 547 | 13% | 16% | 20 a day, more than 2 of the other 4 years | 2 |
| Weather and structures | 461 | 11% | 7% | 16 a day, the most in 5 years | 16 |
| Autumn | 309 | 7% | 7% | 11 a day, more than 3 of the other 4 years | 1 |
| External | 257 | 6% | 4% | 9 a day, the most in 5 years | - |
| Network management | 374 | 9% | 17% | 13 a day, more than 2 of the other 4 years | 30 |
| The operators' causes | |||||
| Train faults | 1,014 | 24% | 16% | 36 a day, more than 2 of the other 4 years | 28 |
| Traincrew | 572 | 13% | 11% | 20 a day, more than 1 of the other 4 years | 70 |
| Stations | 133 | 3% | 3% | 5 a day, more than 2 of the other 4 years | - |
| Operations | 187 | 4% | 5% | 7 a day, more than 2 of the other 4 years | 3 |
| Operator, other | 302 | 7% | 7% | 11 a day, more than 2 of the other 4 years | 5 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 312 |
| TH | (Senior) Conductor/Train Manager | 237 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 183 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 179 |
| MT | Confirmed train borne safety system faults (not cab based) | 165 |
| Q3 | NZ Pumps T | 153 |
| XP | BRIDGE HIT | 150 |
| MD | Technical failures below the solebar | 145 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 143 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 139 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 18,623 |
| MD | Technical failures below the solebar | 9,914 |
| M8 | Technical failures above the Solebar | 7,141 |
| TH | (Senior) Conductor/Train Manager | 6,492 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 6,039 |
| M7 | Door and Door system faults | 5,859 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 4,852 |
| IB | Points failure (including no fault found) | 4,713 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,182 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,749 |