Milton Keynes Central
2,480 delay minutes
The biggest share (30%) of the delay picked up at Milton Keynes Central in the four weeks to 9 December 2023 came from signal, points and power faults.
51% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 62 | 3% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 738 | 30% | 16% | 26 a day, the most in 5 years | 16 |
| Weather and structures | 3 | <1% | 7% | 0 a day, more than 1 of the other 4 years | - |
| Autumn | 11 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 15 | <1% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 466 | 19% | 17% | 17 a day, the most in 5 years | 7 |
| The operators' causes | |||||
| Train faults | 614 | 25% | 16% | 22 a day, the most in 5 years | 14 |
| Traincrew | 336 | 14% | 11% | 12 a day, more than 2 of the other 4 years | 21 |
| Stations | 54 | 2% | 3% | 2 a day, the least in 5 years | - |
| Operations | 43 | 2% | 5% | 2 a day, more than 3 of the other 4 years | - |
| Operator, other | 138 | 6% | 7% | 5 a day, more than 1 of the other 4 years | 3 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 283 |
| IH | Power Supply And Distribution System Failure | 260 |
| IB | Points failure (including no fault found) | 258 |
| TG | Driver | 256 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 216 |
| MD | Technical failures below the solebar | 180 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 74 |
| M8 | Technical failures above the Solebar | 72 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 69 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 63 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,908 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 7,598 |
| IB | Points failure (including no fault found) | 6,047 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,796 |
| M8 | Technical failures above the Solebar | 4,636 |
| TH | (Senior) Conductor/Train Manager | 4,620 |
| I1 | Overhead line/third rail defect | 4,272 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,719 |
| J3 | Axle Counter Failure | 3,494 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 2,951 |