Marks Tey
494 delay minutes
The biggest share (29%) of the delay picked up at Marks Tey in the four weeks to 9 December 2023 came from signal, points and power faults.
67% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 4% | 8% | 1 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 141 | 29% | 16% | 5 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 15 | 3% | 7% | 1 a day, more than 1 of the other 4 years | 2 |
| External | 104 | 21% | 4% | 4 a day, the most in 5 years | - |
| Network management | 83 | 17% | 17% | 3 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | 52 | 11% | 16% | 2 a day, the least in 5 years | 3 |
| Traincrew | 11 | 2% | 11% | 0 a day, the least in 5 years | - |
| Stations | 6 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 25 | 5% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 36 | 7% | 7% | 1 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 69 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 54 |
| IP | Points failure caused by snow or frost where heaters are fitted but found to be not turned on, not operative or defective | 49 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 32 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 30 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 23 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 17 |
| I7 | Engineer's train late into, from or failed in possession | 15 |
| Q3 | NZ Pumps T | 15 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,714 |
| MD | Technical failures below the solebar | 2,427 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,162 |
| TG | Driver | 1,908 |
| M8 | Technical failures above the Solebar | 1,741 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,383 |
| IB | Points failure (including no fault found) | 1,350 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,014 |
| I1 | Overhead line/third rail defect | 956 |
| M7 | Door and Door system faults | 943 |