Mouldsworth
472 delay minutes
The biggest share (26%) of the delay picked up at Mouldsworth in the four weeks to 9 December 2023 came from signal, points and power faults.
24% of these minutes were knock-on from something that happened elsewhere first. 73% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | 1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 123 | 26% | 16% | 4 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 78 | 17% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 23 | 5% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 66 | 14% | 17% | 2 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 67 | 14% | 16% | 2 a day, the most in 5 years | - |
| Traincrew | 21 | 4% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 10 | 2% | 5% | 0 a day, more than 1 of the other 4 years | - |
| Operator, other | 76 | 16% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 67 |
| TT | Leaf fall Neutral | 67 |
| IP | Points failure caused by snow or frost where heaters are fitted but found to be not turned on, not operative or defective | 57 |
| IB | Points failure (including no fault found) | 50 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 45 |
| OU | Delays not Investigated by Network Rail | 42 |
| XP | BRIDGE HIT | 12 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 11 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 10 |
| M8 | Technical failures above the Solebar | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 924 |
| Q3 | NZ Pumps T | 737 |
| TG | Driver | 644 |
| TT | Leaf fall Neutral | 634 |
| TH | (Senior) Conductor/Train Manager | 612 |
| IB | Points failure (including no fault found) | 499 |
| J3 | Axle Counter Failure | 489 |
| TZ | Other Passenger Train Operating Company causes | 479 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 453 |
| MD | Technical failures below the solebar | 434 |