Millom
807 delay minutes
Most of the delay picked up at Millom in the four weeks to 9 December 2023 came from weather and structures.
15% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | <1% | 8% | 0 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 43 | 5% | 16% | 2 a day, more than 3 of the other 4 years | 3 |
| Weather and structures | 503 | 62% | 7% | 18 a day, the most in 5 years | 6 |
| Autumn | 12 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 135 | 17% | 17% | 5 a day, the most in 5 years | 3 |
| The operators' causes | |||||
| Train faults | 25 | 3% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 35 | 4% | 11% | 1 a day, the most in 5 years | 18 |
| Stations | 14 | 2% | 3% | 1 a day, the least in 5 years | - |
| Operations | 21 | 3% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 16 | 2% | 7% | 1 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 472 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 89 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 23 |
| TG | Driver | 23 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 22 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 19 |
| MD | Technical failures below the solebar | 18 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 16 |
| IJ | AWS/ATP/TPWS/Train stop/On track equipment failure | 12 |
| X9 | Points failure caused by severe snow or ice where heaters are fitted and working as designed | 12 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 6,012 |
| IA | Signal failure (including no fault found) | 1,220 |
| MD | Technical failures below the solebar | 932 |
| TG | Driver | 738 |
| IB | Points failure (including no fault found) | 693 |
| IC | Track circuit failure (including no fault found) | 661 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 640 |
| RB | Passengers joining/alighting | 619 |
| XT | Severe snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy) | 472 |
| TH | (Senior) Conductor/Train Manager | 393 |