Leaves on the Line

Millom

MLM North West route
CSV JSON

807 delay minutes

Most of the delay picked up at Millom in the four weeks to 9 December 2023 came from weather and structures.

15% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5<1%8% 0 a day, more than 1 of the other 4 years-
Signals, points and power435%16% 2 a day, more than 3 of the other 4 years3
Weather and structures50362%7% 18 a day, the most in 5 years6
Autumn121%7% 0 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management13517%17% 5 a day, the most in 5 years3
The operators' causes
Train faults253%16% 1 a day, more than 1 of the other 4 years1
Traincrew354%11% 1 a day, the most in 5 years18
Stations142%3% 1 a day, the least in 5 years-
Operations213%5% 1 a day, more than 2 of the other 4 years-
Operator, other162%7% 1 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)472
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards89
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure23
TGDriver23
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)22
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions19
MDTechnical failures below the solebar18
MPRail / wheel interface, adhesion problems (including ice on the running rail)16
IJAWS/ATP/TPWS/Train stop/On track equipment failure12
X9Points failure caused by severe snow or ice where heaters are fitted and working as designed12
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules6,012
IASignal failure (including no fault found)1,220
MDTechnical failures below the solebar932
TGDriver738
IBPoints failure (including no fault found)693
ICTrack circuit failure (including no fault found)661
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles640
RBPassengers joining/alighting619
XTSevere snow or ice affecting infrastructure which is the responsibility of NR (including implementation of Key Route Strategy)472
TH(Senior) Conductor/Train Manager393