Malton
439 delay minutes
The biggest share (20%) of the delay picked up at Malton in the four weeks to 9 December 2023 came from traincrew problems.
42% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 7 | 2% | 8% | 0 a day, more than 1 of the other 4 years | 1 |
| Signals, points and power | 15 | 3% | 16% | 1 a day, more than 1 of the other 4 years | - |
| Weather and structures | 40 | 9% | 7% | 1 a day, more than 3 of the other 4 years | - |
| Autumn | 84 | 19% | 7% | 3 a day, more than 2 of the other 4 years | - |
| External | 8 | 2% | 4% | 0 a day, the least in 5 years | - |
| Network management | 81 | 18% | 17% | 3 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 50 | 11% | 16% | 2 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 90 | 20% | 11% | 3 a day, the most in 5 years | - |
| Stations | 16 | 4% | 3% | 1 a day, the most in 5 years | - |
| Operations | 38 | 9% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 11 | 3% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QH | Adhesion problems due to leaf contamination | 75 |
| TG | Driver | 71 |
| OU | Delays not Investigated by Network Rail | 34 |
| JK | Flooding not due to exceptional weather | 30 |
| MU | Depot operating problem | 27 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 22 |
| Q1 | Takeback Pumps | 13 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 12 |
| TH | (Senior) Conductor/Train Manager | 12 |
| OM | Technical failure associated with a Railhead conditioning train | 9 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 2,100 |
| TG | Driver | 1,583 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 1,064 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 839 |
| IC | Track circuit failure (including no fault found) | 788 |
| MD | Technical failures below the solebar | 784 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 692 |
| M8 | Technical failures above the Solebar | 684 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 618 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 574 |