283 delay minutes

The biggest share (45%) of the delay picked up at Marlow in the four weeks to 9 December 2023 came from signal, points and power faults.

90% of these minutes were knock-on from something that happened elsewhere first. 65% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track6222%8%3
Signals, points and power12845%16%1
Weather and structures--7%-
Autumn1<1%7%-
External--4%-
Network management3914%17%1
The operators' causes
Train faults248%16%1
Traincrew31%11%2
Stations--3%-
Operations124%5%-
Operator, other155%7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
I1Overhead line/third rail defect69
IBPoints failure (including no fault found)49
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.32
OUDelays not Investigated by Network Rail24
IRBroken/cracked/twisted/buckled/flawed rail14
JSCondition of Track TSR outside the Timetable Planning Rules14
VBVandalism or theft14
TCDelays from Traincrew/loco/stock/unit diagrams issues resulting from an agreed mitigation resource plan, at 22:00 the day prior9
M2Delay due to ATO / ETCS equipment8
M7Door and Door system faults8
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)829
JHCritical Rail Temperature speeds, (other than buckled rails)467
TGDriver351
MDTechnical failures below the solebar344
ILToken equipment failure (including no fault found)335
ZUNo Cause Identified After investigation by both Parties322
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions267
M7Door and Door system faults222
I1Overhead line/third rail defect219
M8Technical failures above the Solebar198