Leaves on the Line

Manningtree

MNG Anglia route
CSV JSON

855 delay minutes

The biggest share (23%) of the delay picked up at Manningtree in the four weeks to 9 December 2023 came from weather and structures.

54% of these minutes were knock-on from something that happened elsewhere first. 75% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track647%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power14217%16% 5 a day, more than 1 of the other 4 years-
Weather and structures19923%7% 7 a day, the most in 5 years1
Autumn253%7% 1 a day, more than 1 of the other 4 years-
External415%4% 1 a day, more than 2 of the other 4 years-
Network management17721%17% 6 a day, more than 1 of the other 4 years-
The operators' causes
Train faults8610%16% 3 a day, the least in 5 years-
Traincrew182%11% 1 a day, the least in 5 years-
Stations101%3% 0 a day, more than 1 of the other 4 years-
Operations536%5% 2 a day, more than 3 of the other 4 years2
Operator, other415%7% 1 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)199
J9Preventative Maintenance to the infrastructure in response to a Remote Condition Monitoring Alert63
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.46
IASignal failure (including no fault found)41
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)38
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles36
XKNational Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed)28
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident27
QAWTT schedule and or LTP Process including erroneous simplifiers24
ICTrack circuit failure (including no fault found)22
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.8,347
MDTechnical failures below the solebar2,514
TGDriver2,114
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,964
M8Technical failures above the Solebar1,822
ICTrack circuit failure (including no fault found)1,797
IASignal failure (including no fault found)1,740
MCDiesel Loco failure, defect, attention1,560
IBPoints failure (including no fault found)1,466
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)1,464