Manningtree
855 delay minutes
The biggest share (23%) of the delay picked up at Manningtree in the four weeks to 9 December 2023 came from weather and structures.
54% of these minutes were knock-on from something that happened elsewhere first. 75% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 64 | 7% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 142 | 17% | 16% | 5 a day, more than 1 of the other 4 years | - |
| Weather and structures | 199 | 23% | 7% | 7 a day, the most in 5 years | 1 |
| Autumn | 25 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 41 | 5% | 4% | 1 a day, more than 2 of the other 4 years | - |
| Network management | 177 | 21% | 17% | 6 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 86 | 10% | 16% | 3 a day, the least in 5 years | - |
| Traincrew | 18 | 2% | 11% | 1 a day, the least in 5 years | - |
| Stations | 10 | 1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 53 | 6% | 5% | 2 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 41 | 5% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 199 |
| J9 | Preventative Maintenance to the infrastructure in response to a Remote Condition Monitoring Alert | 63 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 46 |
| IA | Signal failure (including no fault found) | 41 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 38 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 36 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 28 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 27 |
| QA | WTT schedule and or LTP Process including erroneous simplifiers | 24 |
| IC | Track circuit failure (including no fault found) | 22 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 8,347 |
| MD | Technical failures below the solebar | 2,514 |
| TG | Driver | 2,114 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,964 |
| M8 | Technical failures above the Solebar | 1,822 |
| IC | Track circuit failure (including no fault found) | 1,797 |
| IA | Signal failure (including no fault found) | 1,740 |
| MC | Diesel Loco failure, defect, attention | 1,560 |
| IB | Points failure (including no fault found) | 1,466 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 1,464 |