305 delay minutes

The biggest share (17%) of the delay picked up at Mobberley in the four weeks to 9 December 2023 came from other operator causes.

12% of these minutes were knock-on from something that happened elsewhere first. 82% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power3712%16% 1 a day, more than 3 of the other 4 years-
Weather and structures238%7% 1 a day, more than 3 of the other 4 years-
Autumn5217%7% 2 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management4615%17% 2 a day, more than 3 of the other 4 years-
The operators' causes
Train faults134%16% 0 a day, more than 2 of the other 4 years-
Traincrew155%11% 1 a day, the most in 5 years-
Stations279%3% 1 a day, the most in 5 years-
Operations3913%5% 1 a day, the most in 5 years-
Operator, other5317%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MPRail / wheel interface, adhesion problems (including ice on the running rail)48
QICautioning due to railhead leaf contamination44
IISignalling lineside cable fault33
OUDelays not Investigated by Network Rail28
JKFlooding not due to exceptional weather23
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)21
RBPassengers joining/alighting18
TZOther Passenger Train Operating Company causes18
Q1Takeback Pumps12
TH(Senior) Conductor/Train Manager12
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.714
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure683
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)644
IBPoints failure (including no fault found)408
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)340
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)276
MDTechnical failures below the solebar231
RBPassengers joining/alighting215
MPRail / wheel interface, adhesion problems (including ice on the running rail)211
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)208