Marple
0 delay minutes
No delay was picked up at Marple in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 117 |
| XP | BRIDGE HIT | 106 |
| IB | Points failure (including no fault found) | 103 |
| IC | Track circuit failure (including no fault found) | 78 |
| J3 | Axle Counter Failure | 71 |
| OM | Technical failure associated with a Railhead conditioning train | 62 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 60 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 59 |
| II | Signalling lineside cable fault | 56 |
| TH | (Senior) Conductor/Train Manager | 46 |