Moorfields
4 delay minutes
Most of the delay picked up at Moorfields in the four weeks to 9 December 2023 came from faulty trains.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | 4 | 100% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MU | Depot operating problem | 76 |
| MD | Technical failures below the solebar | 51 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 48 |
| I5 | Possession over-run from planned work | 47 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 41 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 39 |
| TH | (Senior) Conductor/Train Manager | 36 |
| I1 | Overhead line/third rail defect | 33 |
| J3 | Axle Counter Failure | 28 |
| M7 | Door and Door system faults | 27 |