Marsden
1,424 delay minutes
The biggest share (22%) of the delay picked up at Marsden in the four weeks to 9 December 2023 came from track faults.
57% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 315 | 22% | 8% | 11 a day, the most in 5 years | - |
| Signals, points and power | 158 | 11% | 16% | 6 a day, the most in 5 years | - |
| Weather and structures | 119 | 8% | 7% | 4 a day, the most in 5 years | - |
| Autumn | 48 | 3% | 7% | 2 a day, more than 1 of the other 4 years | - |
| External | 30 | 2% | 4% | 1 a day, the most in 5 years | - |
| Network management | 300 | 21% | 17% | 11 a day, more than 3 of the other 4 years | 12 |
| The operators' causes | |||||
| Train faults | 137 | 10% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Traincrew | 171 | 12% | 11% | 6 a day, more than 2 of the other 4 years | 1 |
| Stations | 36 | 3% | 3% | 1 a day, more than 3 of the other 4 years | - |
| Operations | 77 | 5% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 34 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 289 |
| TG | Driver | 135 |
| OU | Delays not Investigated by Network Rail | 121 |
| J3 | Axle Counter Failure | 97 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 56 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 43 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 42 |
| MD | Technical failures below the solebar | 41 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 38 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 35 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 4,295 |
| MD | Technical failures below the solebar | 2,330 |
| ZU | No Cause Identified After investigation by both Parties | 1,451 |
| TH | (Senior) Conductor/Train Manager | 1,420 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,376 |
| M7 | Door and Door system faults | 1,360 |
| M8 | Technical failures above the Solebar | 1,316 |
| Q1 | Takeback Pumps | 1,209 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,083 |
| MU | Depot operating problem | 948 |