0 delay minutes
No delay was picked up at Moston in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 112 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 95 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 81 |
| XM | External utility incident including gas, water mains, overhead power lines | 75 |
| MD | Technical failures below the solebar | 74 |
| TA | Train-crew/loco/stock/unit diagram issues | 57 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 36 |
| M8 | Technical failures above the Solebar | 31 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 30 |
| RB | Passengers joining/alighting | 29 |