Leaves on the Line

Minster

MSR Kent route
CSV JSON

509 delay minutes

The biggest share (26%) of the delay picked up at Minster in the four weeks to 9 December 2023 came from how the network was run.

86% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track286%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power5912%16% 2 a day, more than 1 of the other 4 years-
Weather and structures82%7% 0 a day, the most in 5 years-
Autumn5511%7% 2 a day, more than 3 of the other 4 years-
External82%4% 0 a day, more than 1 of the other 4 years-
Network management13026%17% 5 a day, more than 1 of the other 4 years-
The operators' causes
Train faults8917%16% 3 a day, the most in 5 years-
Traincrew489%11% 2 a day, more than 3 of the other 4 years-
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations102%5% 0 a day, the least in 5 years-
Operator, other7214%7% 3 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T55
TTLeaf fall Neutral51
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)51
TITraincrew rostering problem30
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps29
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.26
IBPoints failure (including no fault found)23
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)22
ICTrack circuit failure (including no fault found)19
M0Confirmed train cab based safety system fault (including GSMR)18
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,096
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,129
TGDriver1,367
OCSignaller including mis-routing (not ERTM /ETCS related)1,163
ICTrack circuit failure (including no fault found)896
XRCable vandalism or theft877
IASignal failure (including no fault found)832
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps731
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles708
TZOther Passenger Train Operating Company causes681