Minster
509 delay minutes
The biggest share (26%) of the delay picked up at Minster in the four weeks to 9 December 2023 came from how the network was run.
86% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 28 | 6% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 59 | 12% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 8 | 2% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 55 | 11% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 8 | 2% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 130 | 26% | 17% | 5 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 89 | 17% | 16% | 3 a day, the most in 5 years | - |
| Traincrew | 48 | 9% | 11% | 2 a day, more than 3 of the other 4 years | - |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 10 | 2% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 72 | 14% | 7% | 3 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 55 |
| TT | Leaf fall Neutral | 51 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 51 |
| TI | Traincrew rostering problem | 30 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 29 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 26 |
| IB | Points failure (including no fault found) | 23 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 22 |
| IC | Track circuit failure (including no fault found) | 19 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 18 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,096 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,129 |
| TG | Driver | 1,367 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,163 |
| IC | Track circuit failure (including no fault found) | 896 |
| XR | Cable vandalism or theft | 877 |
| IA | Signal failure (including no fault found) | 832 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 731 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 708 |
| TZ | Other Passenger Train Operating Company causes | 681 |