Leaves on the Line

Mansfield Woodhouse

MSW East Midlands route
CSV JSON

729 delay minutes

The biggest share (29%) of the delay picked up at Mansfield Woodhouse in the four weeks to 9 December 2023 came from autumn leaves.

72% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5<1%8% 0 a day, more than 3 of the other 4 years-
Signals, points and power17824%16% 6 a day, the most in 5 years2
Weather and structures385%7% 1 a day, more than 3 of the other 4 years2
Autumn21529%7% 8 a day, the most in 5 years2
External365%4% 1 a day, more than 3 of the other 4 years-
Network management9413%17% 3 a day, the least in 5 years2
The operators' causes
Train faults466%16% 2 a day, more than 1 of the other 4 years3
Traincrew416%11% 1 a day, the least in 5 years1
Stations223%3% 1 a day, the least in 5 years-
Operations--5% 0 a day, the least in 5 years-
Operator, other558%7% 2 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation142
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles56
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure51
Q3NZ Pumps T46
IASignal failure (including no fault found)39
TGDriver38
MPRail / wheel interface, adhesion problems (including ice on the running rail)37
J0Telecom equipment radio failure (GSM-R)32
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)30
JKFlooding not due to exceptional weather27
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver3,008
Q1Takeback Pumps2,485
ZUNo Cause Identified After investigation by both Parties1,914
MDTechnical failures below the solebar1,885
RBPassengers joining/alighting1,684
M8Technical failures above the Solebar998
Q3NZ Pumps T799
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles772
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure715
M7Door and Door system faults679