Mansfield Woodhouse
729 delay minutes
The biggest share (29%) of the delay picked up at Mansfield Woodhouse in the four weeks to 9 December 2023 came from autumn leaves.
72% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | <1% | 8% | 0 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 178 | 24% | 16% | 6 a day, the most in 5 years | 2 |
| Weather and structures | 38 | 5% | 7% | 1 a day, more than 3 of the other 4 years | 2 |
| Autumn | 215 | 29% | 7% | 8 a day, the most in 5 years | 2 |
| External | 36 | 5% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 94 | 13% | 17% | 3 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 46 | 6% | 16% | 2 a day, more than 1 of the other 4 years | 3 |
| Traincrew | 41 | 6% | 11% | 1 a day, the least in 5 years | 1 |
| Stations | 22 | 3% | 3% | 1 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 55 | 8% | 7% | 2 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 142 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 56 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 51 |
| Q3 | NZ Pumps T | 46 |
| IA | Signal failure (including no fault found) | 39 |
| TG | Driver | 38 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 37 |
| J0 | Telecom equipment radio failure (GSM-R) | 32 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 30 |
| JK | Flooding not due to exceptional weather | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,008 |
| Q1 | Takeback Pumps | 2,485 |
| ZU | No Cause Identified After investigation by both Parties | 1,914 |
| MD | Technical failures below the solebar | 1,885 |
| RB | Passengers joining/alighting | 1,684 |
| M8 | Technical failures above the Solebar | 998 |
| Q3 | NZ Pumps T | 799 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 772 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 715 |
| M7 | Door and Door system faults | 679 |