London Marylebone
1,144 delay minutes
The biggest share (41%) of the delay picked up at London Marylebone in the four weeks to 9 December 2023 came from faulty trains.
44% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 2% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 137 | 12% | 16% | 5 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 50 | 4% | 7% | 2 a day, more than 3 of the other 4 years | 1 |
| External | 42 | 4% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 92 | 8% | 17% | 3 a day, the least in 5 years | 10 |
| The operators' causes | |||||
| Train faults | 470 | 41% | 16% | 17 a day, more than 1 of the other 4 years | 6 |
| Traincrew | 191 | 17% | 11% | 7 a day, more than 2 of the other 4 years | 9 |
| Stations | 35 | 3% | 3% | 1 a day, the least in 5 years | - |
| Operations | 85 | 7% | 5% | 3 a day, the least in 5 years | 31 |
| Operator, other | 20 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 161 |
| MD | Technical failures below the solebar | 136 |
| M8 | Technical failures above the Solebar | 107 |
| M7 | Door and Door system faults | 104 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 63 |
| MY | Coupler, Coupler system and Jumper cable faults | 38 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 35 |
| QJ | Special working for leaf-fall track circuit operation | 35 |
| IC | Track circuit failure (including no fault found) | 34 |
| IB | Points failure (including no fault found) | 32 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 13,794 |
| TG | Driver | 8,999 |
| IC | Track circuit failure (including no fault found) | 6,045 |
| M8 | Technical failures above the Solebar | 5,271 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 4,207 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 3,942 |
| M7 | Door and Door system faults | 3,496 |
| MC | Diesel Loco failure, defect, attention | 3,380 |
| IB | Points failure (including no fault found) | 3,239 |
| MT | Confirmed train borne safety system faults (not cab based) | 2,431 |