108 delay minutes

Most of the delay picked up at New Brighton in the four weeks to 9 December 2023 came from faulty trains.

69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power22%16%-
Weather and structures44%7%2
Autumn21%7%-
External87%4%8
Network management--17%30
The operators' causes
Train faults7469%16%1
Traincrew1312%11%1
Stations--3%-
Operations44%5%-
Operator, other21%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
M7Door and Door system faults29
MDTechnical failures below the solebar23
MUDepot operating problem14
TH(Senior) Conductor/Train Manager13
I9Fires starting on Network Rail Infrastructure8
M8Technical failures above the Solebar8
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)4
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail4
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2
Q3NZ Pumps T2
Since 2018
CodeWhat Network Rail loggedMinutes
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)336
MDTechnical failures below the solebar313
J3Axle Counter Failure268
I9Fires starting on Network Rail Infrastructure259
IBPoints failure (including no fault found)206
M0Confirmed train cab based safety system fault (including GSMR)140
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)135
J0Telecom equipment radio failure (GSM-R)133
XBVandalism or theft (including the placing of objects on the line)127
M8Technical failures above the Solebar121