New Brighton
108 delay minutes
Most of the delay picked up at New Brighton in the four weeks to 9 December 2023 came from faulty trains.
69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 2 | 2% | 16% | - |
| Weather and structures | 4 | 4% | 7% | 2 |
| Autumn | 2 | 1% | 7% | - |
| External | 8 | 7% | 4% | 8 |
| Network management | - | - | 17% | 30 |
| The operators' causes | ||||
| Train faults | 74 | 69% | 16% | 1 |
| Traincrew | 13 | 12% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | 4 | 4% | 5% | - |
| Operator, other | 2 | 1% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M7 | Door and Door system faults | 29 |
| MD | Technical failures below the solebar | 23 |
| MU | Depot operating problem | 14 |
| TH | (Senior) Conductor/Train Manager | 13 |
| I9 | Fires starting on Network Rail Infrastructure | 8 |
| M8 | Technical failures above the Solebar | 8 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 4 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 4 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2 |
| Q3 | NZ Pumps T | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 336 |
| MD | Technical failures below the solebar | 313 |
| J3 | Axle Counter Failure | 268 |
| I9 | Fires starting on Network Rail Infrastructure | 259 |
| IB | Points failure (including no fault found) | 206 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 140 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 135 |
| J0 | Telecom equipment radio failure (GSM-R) | 133 |
| XB | Vandalism or theft (including the placing of objects on the line) | 127 |
| M8 | Technical failures above the Solebar | 121 |