1,048 delay minutes
The biggest share (25%) of the delay picked up at Newark Castle in the four weeks to 9 December 2023 came from autumn leaves.
77% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 64 | 6% | 8% | 2 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 64 | 6% | 16% | 2 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 38 | 4% | 7% | 1 a day, the most in 5 years | 1 |
| Autumn | 266 | 25% | 7% | 10 a day, the most in 5 years | 1 |
| External | 19 | 2% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 95 | 9% | 17% | 3 a day, more than 2 of the other 4 years | 12 |
| The operators' causes | |||||
| Train faults | 177 | 17% | 16% | 6 a day, the most in 5 years | - |
| Traincrew | 36 | 3% | 11% | 1 a day, the most in 5 years | - |
| Stations | 70 | 7% | 3% | 3 a day, the most in 5 years | - |
| Operations | 13 | 1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 207 | 20% | 7% | 7 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 153 |
| TT | Leaf fall Neutral | 141 |
| MD | Technical failures below the solebar | 139 |
| QJ | Special working for leaf-fall track circuit operation | 102 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 55 |
| VZ | Other passenger or external causes the responsibility of TOC | 41 |
| TG | Driver | 33 |
| RB | Passengers joining/alighting | 32 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 30 |
| JK | Flooding not due to exceptional weather | 26 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,746 |
| MD | Technical failures below the solebar | 1,654 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 1,521 |
| Q3 | NZ Pumps T | 1,264 |
| TT | Leaf fall Neutral | 1,029 |
| M8 | Technical failures above the Solebar | 939 |
| Q1 | Takeback Pumps | 840 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 812 |
| IC | Track circuit failure (including no fault found) | 794 |
| RB | Passengers joining/alighting | 651 |