Leaves on the Line

Newark Castle

NCT East Midlands route
CSV JSON

1,048 delay minutes

The biggest share (25%) of the delay picked up at Newark Castle in the four weeks to 9 December 2023 came from autumn leaves.

77% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track646%8% 2 a day, more than 3 of the other 4 years-
Signals, points and power646%16% 2 a day, more than 2 of the other 4 years1
Weather and structures384%7% 1 a day, the most in 5 years1
Autumn26625%7% 10 a day, the most in 5 years1
External192%4% 1 a day, more than 1 of the other 4 years-
Network management959%17% 3 a day, more than 2 of the other 4 years12
The operators' causes
Train faults17717%16% 6 a day, the most in 5 years-
Traincrew363%11% 1 a day, the most in 5 years-
Stations707%3% 3 a day, the most in 5 years-
Operations131%5% 0 a day, more than 3 of the other 4 years-
Operator, other20720%7% 7 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T153
TTLeaf fall Neutral141
MDTechnical failures below the solebar139
QJSpecial working for leaf-fall track circuit operation102
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.55
VZOther passenger or external causes the responsibility of TOC41
TGDriver33
RBPassengers joining/alighting32
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles30
JKFlooding not due to exceptional weather26
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,746
MDTechnical failures below the solebar1,654
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles1,521
Q3NZ Pumps T1,264
TTLeaf fall Neutral1,029
M8Technical failures above the Solebar939
Q1Takeback Pumps840
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure812
ICTrack circuit failure (including no fault found)794
RBPassengers joining/alighting651