1,051 delay minutes

The biggest share (27%) of the delay picked up at Nunhead in the four weeks to 9 December 2023 came from how the network was run.

89% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track616%8% 2 a day, the most in 5 years-
Signals, points and power12011%16% 4 a day, more than 2 of the other 4 years-
Weather and structures172%7% 1 a day, more than 2 of the other 4 years-
Autumn979%7% 3 a day, more than 3 of the other 4 years-
External252%4% 1 a day, more than 1 of the other 4 years-
Network management28627%17% 10 a day, more than 2 of the other 4 years-
The operators' causes
Train faults12912%16% 5 a day, more than 3 of the other 4 years-
Traincrew858%11% 3 a day, more than 3 of the other 4 years-
Stations111%3% 0 a day, more than 3 of the other 4 years-
Operations192%5% 1 a day, more than 1 of the other 4 years-
Operator, other20219%7% 7 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)138
Q3NZ Pumps T97
TTLeaf fall Neutral95
VHPassenger Communication cord, door egress or emergency train alarm operated90
TGDriver63
MNBrake and brake systems faults; including wheel flats where no other cause had been identified53
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.51
OCSignaller including mis-routing (not ERTM /ETCS related)50
OBDelayed by signaller not applying applicable regulating policy33
IISignalling lineside cable fault32
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)10,777
TGDriver2,557
VHPassenger Communication cord, door egress or emergency train alarm operated2,426
OBDelayed by signaller not applying applicable regulating policy2,304
OCSignaller including mis-routing (not ERTM /ETCS related)2,202
ICTrack circuit failure (including no fault found)2,147
IBPoints failure (including no fault found)1,630
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,555
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,173
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,019