Nunhead
1,051 delay minutes
The biggest share (27%) of the delay picked up at Nunhead in the four weeks to 9 December 2023 came from how the network was run.
89% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 61 | 6% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 120 | 11% | 16% | 4 a day, more than 2 of the other 4 years | - |
| Weather and structures | 17 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 97 | 9% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 25 | 2% | 4% | 1 a day, more than 1 of the other 4 years | - |
| Network management | 286 | 27% | 17% | 10 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 129 | 12% | 16% | 5 a day, more than 3 of the other 4 years | - |
| Traincrew | 85 | 8% | 11% | 3 a day, more than 3 of the other 4 years | - |
| Stations | 11 | 1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 19 | 2% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 202 | 19% | 7% | 7 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 138 |
| Q3 | NZ Pumps T | 97 |
| TT | Leaf fall Neutral | 95 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 90 |
| TG | Driver | 63 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 53 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 51 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 50 |
| OB | Delayed by signaller not applying applicable regulating policy | 33 |
| II | Signalling lineside cable fault | 32 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 10,777 |
| TG | Driver | 2,557 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 2,426 |
| OB | Delayed by signaller not applying applicable regulating policy | 2,304 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,202 |
| IC | Track circuit failure (including no fault found) | 2,147 |
| IB | Points failure (including no fault found) | 1,630 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,555 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,173 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,019 |