2,302 delay minutes

The biggest share (24%) of the delay picked up at Northampton in the four weeks to 9 December 2023 came from faulty trains.

59% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1908%8% 7 a day, more than 2 of the other 4 years-
Signals, points and power47821%16% 17 a day, more than 3 of the other 4 years15
Weather and structures261%7% 1 a day, the least in 5 years-
Autumn9<1%7% 0 a day, more than 3 of the other 4 years-
External683%4% 2 a day, the most in 5 years-
Network management28212%17% 10 a day, more than 3 of the other 4 years66
The operators' causes
Train faults55124%16% 20 a day, more than 3 of the other 4 years14
Traincrew48121%11% 17 a day, more than 2 of the other 4 years23
Stations19<1%3% 1 a day, more than 1 of the other 4 years-
Operations743%5% 3 a day, more than 1 of the other 4 years1
Operator, other1265%7% 4 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver341
IBPoints failure (including no fault found)281
M8Technical failures above the Solebar211
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)170
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.162
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards131
IHPower Supply And Distribution System Failure84
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)68
TH(Senior) Conductor/Train Manager63
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure54
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver19,507
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.9,369
TH(Senior) Conductor/Train Manager7,111
M8Technical failures above the Solebar6,984
IBPoints failure (including no fault found)5,673
I1Overhead line/third rail defect4,826
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3,649
IRBroken/cracked/twisted/buckled/flawed rail3,611
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps3,340
MDTechnical failures below the solebar3,315