Northampton
2,302 delay minutes
The biggest share (24%) of the delay picked up at Northampton in the four weeks to 9 December 2023 came from faulty trains.
59% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 190 | 8% | 8% | 7 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 478 | 21% | 16% | 17 a day, more than 3 of the other 4 years | 15 |
| Weather and structures | 26 | 1% | 7% | 1 a day, the least in 5 years | - |
| Autumn | 9 | <1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 68 | 3% | 4% | 2 a day, the most in 5 years | - |
| Network management | 282 | 12% | 17% | 10 a day, more than 3 of the other 4 years | 66 |
| The operators' causes | |||||
| Train faults | 551 | 24% | 16% | 20 a day, more than 3 of the other 4 years | 14 |
| Traincrew | 481 | 21% | 11% | 17 a day, more than 2 of the other 4 years | 23 |
| Stations | 19 | <1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 74 | 3% | 5% | 3 a day, more than 1 of the other 4 years | 1 |
| Operator, other | 126 | 5% | 7% | 4 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 341 |
| IB | Points failure (including no fault found) | 281 |
| M8 | Technical failures above the Solebar | 211 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 170 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 162 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 131 |
| IH | Power Supply And Distribution System Failure | 84 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 68 |
| TH | (Senior) Conductor/Train Manager | 63 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 54 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 19,507 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 9,369 |
| TH | (Senior) Conductor/Train Manager | 7,111 |
| M8 | Technical failures above the Solebar | 6,984 |
| IB | Points failure (including no fault found) | 5,673 |
| I1 | Overhead line/third rail defect | 4,826 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3,649 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,611 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 3,340 |
| MD | Technical failures below the solebar | 3,315 |