1,434 delay minutes

The biggest share (20%) of the delay picked up at Nunthorpe in the four weeks to 9 December 2023 came from how the network was run.

81% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track393%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power1269%16% 5 a day, more than 3 of the other 4 years-
Weather and structures846%7% 3 a day, the most in 5 years-
Autumn816%7% 3 a day, the most in 5 years-
External705%4% 3 a day, more than 3 of the other 4 years-
Network management29120%17% 10 a day, more than 3 of the other 4 years3
The operators' causes
Train faults22316%16% 8 a day, the most in 5 years-
Traincrew15311%11% 5 a day, the most in 5 years5
Stations997%3% 4 a day, the most in 5 years-
Operations23016%5% 8 a day, the most in 5 years1
Operator, other383%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TZOther Passenger Train Operating Company causes155
OUDelays not Investigated by Network Rail144
M7Door and Door system faults105
TGDriver86
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail79
TH(Senior) Conductor/Train Manager63
J0Telecom equipment radio failure (GSM-R)62
MDTechnical failures below the solebar51
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident51
XPBRIDGE HIT50
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)6,296
TGDriver2,490
TZOther Passenger Train Operating Company causes2,360
MDTechnical failures below the solebar1,794
RBPassengers joining/alighting1,731
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,417
JHCritical Rail Temperature speeds, (other than buckled rails)1,374
IBPoints failure (including no fault found)1,333
JSCondition of Track TSR outside the Timetable Planning Rules1,060
M7Door and Door system faults975