Nottingham
6,596 delay minutes
The biggest share (24%) of the delay picked up at Nottingham in the four weeks to 9 December 2023 came from faulty trains.
66% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 474 | 7% | 8% | 17 a day, the most in 5 years | 7 |
| Signals, points and power | 1,040 | 16% | 16% | 37 a day, the most in 5 years | 17 |
| Weather and structures | 430 | 7% | 7% | 15 a day, more than 3 of the other 4 years | 16 |
| Autumn | 707 | 11% | 7% | 25 a day, the most in 5 years | 2 |
| External | 229 | 3% | 4% | 8 a day, more than 3 of the other 4 years | 2 |
| Network management | 634 | 10% | 17% | 23 a day, more than 2 of the other 4 years | 77 |
| The operators' causes | |||||
| Train faults | 1,556 | 24% | 16% | 56 a day, more than 3 of the other 4 years | 26 |
| Traincrew | 683 | 10% | 11% | 24 a day, the most in 5 years | 53 |
| Stations | 251 | 4% | 3% | 9 a day, the most in 5 years | - |
| Operations | 154 | 2% | 5% | 5 a day, more than 2 of the other 4 years | - |
| Operator, other | 440 | 7% | 7% | 16 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 371 |
| MD | Technical failures below the solebar | 355 |
| M8 | Technical failures above the Solebar | 338 |
| QJ | Special working for leaf-fall track circuit operation | 338 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 305 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 286 |
| Q3 | NZ Pumps T | 283 |
| JK | Flooding not due to exceptional weather | 259 |
| M7 | Door and Door system faults | 244 |
| TH | (Senior) Conductor/Train Manager | 192 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 19,036 |
| M8 | Technical failures above the Solebar | 18,341 |
| TG | Driver | 14,547 |
| TH | (Senior) Conductor/Train Manager | 8,047 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 7,954 |
| M7 | Door and Door system faults | 7,917 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 5,611 |
| MU | Depot operating problem | 4,198 |
| MY | Coupler, Coupler system and Jumper cable faults | 4,172 |
| TI | Traincrew rostering problem | 4,160 |