Newquay
155 delay minutes
The biggest share (35%) of the delay picked up at Newquay in the four weeks to 9 December 2023 came from signal, points and power faults.
64% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 8 | 5% | 8% | - |
| Signals, points and power | 54 | 35% | 16% | 2 |
| Weather and structures | 26 | 17% | 7% | - |
| Autumn | - | - | 7% | - |
| External | 11 | 7% | 4% | - |
| Network management | 21 | 14% | 17% | 1 |
| The operators' causes | ||||
| Train faults | 32 | 21% | 16% | 1 |
| Traincrew | - | - | 11% | 3 |
| Stations | 3 | 2% | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 45 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 32 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 16 |
| OU | Delays not Investigated by Network Rail | 11 |
| XB | Vandalism or theft (including the placing of objects on the line) | 11 |
| JK | Flooding not due to exceptional weather | 10 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 6 |
| IC | Track circuit failure (including no fault found) | 5 |
| IA | Signal failure (including no fault found) | 4 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 790 |
| TG | Driver | 388 |
| IB | Points failure (including no fault found) | 335 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 300 |
| IC | Track circuit failure (including no fault found) | 189 |
| ZU | No Cause Identified After investigation by both Parties | 185 |
| M8 | Technical failures above the Solebar | 182 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 176 |
| M7 | Door and Door system faults | 175 |
| J3 | Axle Counter Failure | 137 |