Newbury Racecourse
34 delay minutes
The biggest share (32%) of the delay picked up at Newbury Racecourse in the four weeks to 9 December 2023 came from weather and structures.
100% of these minutes were knock-on from something that happened elsewhere first. 68% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | 11 | 32% | 7% | - |
| Autumn | 5 | 15% | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 1 |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | 8 | 24% | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 5 | 15% | 5% | - |
| Operator, other | 5 | 15% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 11 |
| TG | Driver | 8 |
| Q3 | NZ Pumps T | 5 |
| TT | Leaf fall Neutral | 5 |
| TZ | Other Passenger Train Operating Company causes | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 114 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 62 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 52 |
| J3 | Axle Counter Failure | 37 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 37 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 36 |
| TH | (Senior) Conductor/Train Manager | 36 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 26 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 25 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 23 |