Newton Abbot
914 delay minutes
The biggest share (24%) of the delay picked up at Newton Abbot in the four weeks to 9 December 2023 came from signal, points and power faults.
69% of these minutes were knock-on from something that happened elsewhere first. 88% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 162 | 18% | 8% | 6 a day, the most in 5 years | 1 |
| Signals, points and power | 219 | 24% | 16% | 8 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 76 | 8% | 7% | 3 a day, more than 2 of the other 4 years | - |
| Autumn | 28 | 3% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 16 | 2% | 4% | 1 a day, the least in 5 years | - |
| Network management | 83 | 9% | 17% | 3 a day, more than 1 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 179 | 20% | 16% | 6 a day, more than 2 of the other 4 years | 3 |
| Traincrew | 70 | 8% | 11% | 3 a day, the most in 5 years | 4 |
| Stations | 27 | 3% | 3% | 1 a day, the least in 5 years | - |
| Operations | 33 | 4% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 22 | 2% | 7% | 1 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| J3 | Axle Counter Failure | 89 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 87 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 75 |
| OU | Delays not Investigated by Network Rail | 59 |
| IC | Track circuit failure (including no fault found) | 56 |
| TG | Driver | 55 |
| IB | Points failure (including no fault found) | 40 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 38 |
| MD | Technical failures below the solebar | 33 |
| TZ | Other Passenger Train Operating Company causes | 33 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 4,169 |
| MD | Technical failures below the solebar | 4,168 |
| TG | Driver | 2,724 |
| M8 | Technical failures above the Solebar | 2,463 |
| IB | Points failure (including no fault found) | 1,718 |
| M7 | Door and Door system faults | 1,709 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,685 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,572 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,400 |
| J3 | Axle Counter Failure | 1,399 |