Nuneaton
2,171 delay minutes
The biggest share (25%) of the delay picked up at Nuneaton in the four weeks to 9 December 2023 came from signal, points and power faults.
65% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 32 | 1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 552 | 25% | 16% | 20 a day, the most in 5 years | 3 |
| Weather and structures | 45 | 2% | 7% | 2 a day, more than 1 of the other 4 years | - |
| Autumn | 134 | 6% | 7% | 5 a day, the most in 5 years | - |
| External | 5 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 317 | 15% | 17% | 11 a day, more than 3 of the other 4 years | 2 |
| The operators' causes | |||||
| Train faults | 486 | 22% | 16% | 17 a day, more than 2 of the other 4 years | 2 |
| Traincrew | 234 | 11% | 11% | 8 a day, more than 3 of the other 4 years | 48 |
| Stations | 93 | 4% | 3% | 3 a day, more than 3 of the other 4 years | - |
| Operations | 89 | 4% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 184 | 8% | 7% | 7 a day, more than 3 of the other 4 years | 4 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IH | Power Supply And Distribution System Failure | 373 |
| TG | Driver | 155 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 140 |
| IB | Points failure (including no fault found) | 99 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 84 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 79 |
| Q3 | NZ Pumps T | 70 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 63 |
| RB | Passengers joining/alighting | 52 |
| TH | (Senior) Conductor/Train Manager | 44 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 7,317 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 6,739 |
| IB | Points failure (including no fault found) | 5,121 |
| TG | Driver | 5,040 |
| J3 | Axle Counter Failure | 3,898 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,790 |
| M8 | Technical failures above the Solebar | 2,738 |
| I1 | Overhead line/third rail defect | 2,729 |
| MD | Technical failures below the solebar | 2,711 |
| XP | BRIDGE HIT | 2,575 |