Leaves on the Line

Nuneaton

NUN West Coast South route
CSV JSON

2,171 delay minutes

The biggest share (25%) of the delay picked up at Nuneaton in the four weeks to 9 December 2023 came from signal, points and power faults.

65% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track321%8% 1 a day, the least in 5 years-
Signals, points and power55225%16% 20 a day, the most in 5 years3
Weather and structures452%7% 2 a day, more than 1 of the other 4 years-
Autumn1346%7% 5 a day, the most in 5 years-
External5<1%4% 0 a day, the least in 5 years-
Network management31715%17% 11 a day, more than 3 of the other 4 years2
The operators' causes
Train faults48622%16% 17 a day, more than 2 of the other 4 years2
Traincrew23411%11% 8 a day, more than 3 of the other 4 years48
Stations934%3% 3 a day, more than 3 of the other 4 years-
Operations894%5% 3 a day, more than 3 of the other 4 years-
Operator, other1848%7% 7 a day, more than 3 of the other 4 years4

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IHPower Supply And Distribution System Failure373
TGDriver155
MNBrake and brake systems faults; including wheel flats where no other cause had been identified140
IBPoints failure (including no fault found)99
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)84
MPRail / wheel interface, adhesion problems (including ice on the running rail)79
Q3NZ Pumps T70
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards63
RBPassengers joining/alighting52
TH(Senior) Conductor/Train Manager44
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail7,317
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.6,739
IBPoints failure (including no fault found)5,121
TGDriver5,040
J3Axle Counter Failure3,898
JSCondition of Track TSR outside the Timetable Planning Rules3,790
M8Technical failures above the Solebar2,738
I1Overhead line/third rail defect2,729
MDTechnical failures below the solebar2,711
XPBRIDGE HIT2,575