North Walsham
147 delay minutes
The biggest share (48%) of the delay picked up at North Walsham in the four weeks to 9 December 2023 came from other operator causes.
75% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 21 | 14% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | 11 | 7% | 7% | 0 a day, the most in 5 years | - |
| Autumn | 18 | 12% | 7% | 1 a day, the least in 5 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 24 | 16% | 17% | 1 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 3 | 2% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | - | - | 11% | 0 a day, the least in 5 years | - |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 70 | 48% | 7% | 3 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| FW | Late start/yard overtime not explained by Operator | 56 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 15 |
| OA | Regulation Decision Made With Best Endeavours | 14 |
| Q3 | NZ Pumps T | 14 |
| TT | Leaf fall Neutral | 12 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 6 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 6 |
| JK | Flooding not due to exceptional weather | 5 |
| QJ | Special working for leaf-fall track circuit operation | 4 |
| II | Signalling lineside cable fault | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q1 | Takeback Pumps | 2,297 |
| DD | Technical Fleet Holding Code | 2,162 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,076 |
| MD | Technical failures below the solebar | 972 |
| J3 | Axle Counter Failure | 894 |
| MU | Depot operating problem | 865 |
| TG | Driver | 566 |
| M8 | Technical failures above the Solebar | 490 |
| M7 | Door and Door system faults | 392 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 359 |