Leaves on the Line

New Cross

NWX Kent route
CSV JSON

135 delay minutes

Most of the delay picked up at New Cross in the four weeks to 9 December 2023 came from faulty trains.

92% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track107%8%-
Signals, points and power--16%2
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%7
The operators' causes
Train faults9772%16%1
Traincrew2317%11%1
Stations--3%-
Operations--5%-
Operator, other54%7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified82
TGDriver17
MUDepot operating problem15
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.10
FETrain Crew not available including after rest6
VHPassenger Communication cord, door egress or emergency train alarm operated5
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)288
MNBrake and brake systems faults; including wheel flats where no other cause had been identified233
IBPoints failure (including no fault found)177
I9Fires starting on Network Rail Infrastructure164
M0Confirmed train cab based safety system fault (including GSMR)147
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards145
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)132
MDTechnical failures below the solebar127
IHPower Supply And Distribution System Failure127
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)125