2,661 delay minutes

The biggest share (47%) of the delay picked up at New Cross Gate in the four weeks to 9 December 2023 came from signal, points and power faults.

55% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1164%8% 4 a day, more than 3 of the other 4 years-
Signals, points and power1,26047%16% 45 a day, the most in 5 years4
Weather and structures1044%7% 4 a day, the most in 5 years1
Autumn18<1%7% 1 a day, more than 3 of the other 4 years-
External693%4% 2 a day, more than 3 of the other 4 years-
Network management49419%17% 18 a day, more than 2 of the other 4 years10
The operators' causes
Train faults964%16% 3 a day, the least in 5 years6
Traincrew1737%11% 6 a day, more than 1 of the other 4 years4
Stations1757%3% 6 a day, more than 2 of the other 4 years3
Operations1034%5% 4 a day, the most in 5 years1
Operator, other532%7% 2 a day, more than 1 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IISignalling lineside cable fault981
RBPassengers joining/alighting149
TGDriver142
I1Overhead line/third rail defect127
ITRough ride or bumps reported - cause not known or no fault found100
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)100
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)90
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)88
IBPoints failure (including no fault found)83
ODDelays due to National/Regional/Route Operations directives or Route Control decision or directive72
Since 2018
CodeWhat Network Rail loggedMinutes
IRBroken/cracked/twisted/buckled/flawed rail15,883
TGDriver14,724
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)9,486
ICTrack circuit failure (including no fault found)7,555
RBPassengers joining/alighting6,570
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,888
OCSignaller including mis-routing (not ERTM /ETCS related)4,468
IISignalling lineside cable fault4,271
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure3,624
OBDelayed by signaller not applying applicable regulating policy3,215