New Cross Gate
2,661 delay minutes
The biggest share (47%) of the delay picked up at New Cross Gate in the four weeks to 9 December 2023 came from signal, points and power faults.
55% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 116 | 4% | 8% | 4 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 1,260 | 47% | 16% | 45 a day, the most in 5 years | 4 |
| Weather and structures | 104 | 4% | 7% | 4 a day, the most in 5 years | 1 |
| Autumn | 18 | <1% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 69 | 3% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 494 | 19% | 17% | 18 a day, more than 2 of the other 4 years | 10 |
| The operators' causes | |||||
| Train faults | 96 | 4% | 16% | 3 a day, the least in 5 years | 6 |
| Traincrew | 173 | 7% | 11% | 6 a day, more than 1 of the other 4 years | 4 |
| Stations | 175 | 7% | 3% | 6 a day, more than 2 of the other 4 years | 3 |
| Operations | 103 | 4% | 5% | 4 a day, the most in 5 years | 1 |
| Operator, other | 53 | 2% | 7% | 2 a day, more than 1 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 981 |
| RB | Passengers joining/alighting | 149 |
| TG | Driver | 142 |
| I1 | Overhead line/third rail defect | 127 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 100 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 100 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 90 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 88 |
| IB | Points failure (including no fault found) | 83 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 72 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 15,883 |
| TG | Driver | 14,724 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 9,486 |
| IC | Track circuit failure (including no fault found) | 7,555 |
| RB | Passengers joining/alighting | 6,570 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,888 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4,468 |
| II | Signalling lineside cable fault | 4,271 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,624 |
| OB | Delayed by signaller not applying applicable regulating policy | 3,215 |