Okehampton
353 delay minutes
The biggest share (46%) of the delay picked up at Okehampton in the four weeks to 9 December 2023 came from autumn leaves.
69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | <1% | 8% | - |
| Signals, points and power | 29 | 8% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | 163 | 46% | 7% | 1 |
| External | - | - | 4% | - |
| Network management | 129 | 37% | 17% | 2 |
| The operators' causes | ||||
| Train faults | 22 | 6% | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 7 | 2% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QI | Cautioning due to railhead leaf contamination | 156 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 122 |
| IC | Track circuit failure (including no fault found) | 21 |
| MR | Sanders and scrubber faults | 15 |
| MD | Technical failures below the solebar | 7 |
| Q3 | NZ Pumps T | 7 |
| TT | Leaf fall Neutral | 7 |
| ZU | No Cause Identified After investigation by both Parties | 6 |
| IB | Points failure (including no fault found) | 5 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 573 |
| IE | Signalling Functional Power Supply Failure | 295 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 234 |
| MD | Technical failures below the solebar | 204 |
| QI | Cautioning due to railhead leaf contamination | 191 |
| X8 | Animal Strike or incursion not within the control of Network Rail | 190 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 180 |
| JT | Points failure caused by snow or frost where heaters are not fitted | 176 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 165 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 163 |