Leaves on the Line

Okehampton

OKE Western route
CSV JSON

353 delay minutes

The biggest share (46%) of the delay picked up at Okehampton in the four weeks to 9 December 2023 came from autumn leaves.

69% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track3<1%8%-
Signals, points and power298%16%-
Weather and structures--7%-
Autumn16346%7%1
External--4%-
Network management12937%17%2
The operators' causes
Train faults226%16%1
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other72%7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QICautioning due to railhead leaf contamination156
I8Animal Strike or Incursion within the control of Network Rail122
ICTrack circuit failure (including no fault found)21
MRSanders and scrubber faults15
MDTechnical failures below the solebar7
Q3NZ Pumps T7
TTLeaf fall Neutral7
ZUNo Cause Identified After investigation by both Parties6
IBPoints failure (including no fault found)5
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles3
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules573
IESignalling Functional Power Supply Failure295
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail234
MDTechnical failures below the solebar204
QICautioning due to railhead leaf contamination191
X8Animal Strike or incursion not within the control of Network Rail190
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards180
JTPoints failure caused by snow or frost where heaters are not fitted176
I8Animal Strike or Incursion within the control of Network Rail165
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions163