Leaves on the Line

Ormskirk

OMS North West route
CSV JSON

1,299 delay minutes

The biggest share (29%) of the delay picked up at Ormskirk in the four weeks to 9 December 2023 came from faulty trains.

63% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track877%8% 3 a day, the most in 5 years6
Signals, points and power13110%16% 5 a day, more than 1 of the other 4 years4
Weather and structures705%7% 3 a day, more than 3 of the other 4 years-
Autumn564%7% 2 a day, the least in 5 years1
External685%4% 2 a day, the most in 5 years3
Network management25820%17% 9 a day, the most in 5 years7
The operators' causes
Train faults37129%16% 13 a day, more than 3 of the other 4 years28
Traincrew14411%11% 5 a day, more than 1 of the other 4 years15
Stations7<1%3% 0 a day, the least in 5 years-
Operations857%5% 3 a day, more than 1 of the other 4 years1
Operator, other232%7% 1 a day, the least in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager124
OUDelays not Investigated by Network Rail121
M8Technical failures above the Solebar98
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.87
M7Door and Door system faults83
XBVandalism or theft (including the placing of objects on the line)68
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail64
MDTechnical failures below the solebar63
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)59
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)58
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar3,290
TGDriver2,722
Q3NZ Pumps T2,584
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,133
TTLeaf fall Neutral1,999
TH(Senior) Conductor/Train Manager1,531
RCre-booked assistance for a person with reduced mobility joining/alighting,1,489
RBPassengers joining/alighting1,474
M7Door and Door system faults1,394
ICTrack circuit failure (including no fault found)1,306