Ormskirk
1,299 delay minutes
The biggest share (29%) of the delay picked up at Ormskirk in the four weeks to 9 December 2023 came from faulty trains.
63% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 87 | 7% | 8% | 3 a day, the most in 5 years | 6 |
| Signals, points and power | 131 | 10% | 16% | 5 a day, more than 1 of the other 4 years | 4 |
| Weather and structures | 70 | 5% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 56 | 4% | 7% | 2 a day, the least in 5 years | 1 |
| External | 68 | 5% | 4% | 2 a day, the most in 5 years | 3 |
| Network management | 258 | 20% | 17% | 9 a day, the most in 5 years | 7 |
| The operators' causes | |||||
| Train faults | 371 | 29% | 16% | 13 a day, more than 3 of the other 4 years | 28 |
| Traincrew | 144 | 11% | 11% | 5 a day, more than 1 of the other 4 years | 15 |
| Stations | 7 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 85 | 7% | 5% | 3 a day, more than 1 of the other 4 years | 1 |
| Operator, other | 23 | 2% | 7% | 1 a day, the least in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TH | (Senior) Conductor/Train Manager | 124 |
| OU | Delays not Investigated by Network Rail | 121 |
| M8 | Technical failures above the Solebar | 98 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 87 |
| M7 | Door and Door system faults | 83 |
| XB | Vandalism or theft (including the placing of objects on the line) | 68 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 64 |
| MD | Technical failures below the solebar | 63 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 59 |
| M1 | Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC) | 58 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 3,290 |
| TG | Driver | 2,722 |
| Q3 | NZ Pumps T | 2,584 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,133 |
| TT | Leaf fall Neutral | 1,999 |
| TH | (Senior) Conductor/Train Manager | 1,531 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,489 |
| RB | Passengers joining/alighting | 1,474 |
| M7 | Door and Door system faults | 1,394 |
| IC | Track circuit failure (including no fault found) | 1,306 |