Ore
538 delay minutes
Most of the delay picked up at Ore in the four weeks to 9 December 2023 came from signal, points and power faults.
93% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 26 | 5% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 300 | 56% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 18 | 3% | 7% | 1 a day, the most in 5 years | - |
| External | 23 | 4% | 4% | 1 a day, the most in 5 years | - |
| Network management | 101 | 19% | 17% | 4 a day, the most in 5 years | 58 |
| The operators' causes | |||||
| Train faults | 6 | 1% | 16% | 0 a day, more than 1 of the other 4 years | 1 |
| Traincrew | 42 | 8% | 11% | 2 a day, more than 3 of the other 4 years | 1 |
| Stations | 6 | 1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 6 | 1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 11 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IG | Block failure | 193 |
| IB | Points failure (including no fault found) | 43 |
| TG | Driver | 42 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 40 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 21 |
| I1 | Overhead line/third rail defect | 20 |
| J0 | Telecom equipment radio failure (GSM-R) | 20 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 17 |
| XB | Vandalism or theft (including the placing of objects on the line) | 17 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,286 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,049 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 686 |
| IC | Track circuit failure (including no fault found) | 536 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 414 |
| IB | Points failure (including no fault found) | 308 |
| MD | Technical failures below the solebar | 293 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 272 |
| TI | Traincrew rostering problem | 265 |
| IG | Block failure | 224 |