Orpington

ORP Kent route
CSV JSON

3,730 delay minutes

The biggest share (26%) of the delay picked up at Orpington in the four weeks to 9 December 2023 came from other operator causes.

85% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1584%8% 6 a day, more than 3 of the other 4 years3
Signals, points and power45812%16% 16 a day, more than 2 of the other 4 years9
Weather and structures30<1%7% 1 a day, more than 3 of the other 4 years-
Autumn51814%7% 18 a day, the most in 5 years-
External18<1%4% 1 a day, the least in 5 years1
Network management56115%17% 20 a day, more than 2 of the other 4 years15
The operators' causes
Train faults48613%16% 17 a day, more than 3 of the other 4 years13
Traincrew36210%11% 13 a day, more than 3 of the other 4 years5
Stations1003%3% 4 a day, more than 3 of the other 4 years1
Operations732%5% 3 a day, more than 2 of the other 4 years1
Operator, other96826%7% 35 a day, more than 3 of the other 4 years4

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T498
TTLeaf fall Neutral481
VHPassenger Communication cord, door egress or emergency train alarm operated353
TGDriver328
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)221
ICTrack circuit failure (including no fault found)158
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.132
M0Confirmed train cab based safety system fault (including GSMR)107
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure100
OCSignaller including mis-routing (not ERTM /ETCS related)89
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)16,144
TGDriver11,319
ICTrack circuit failure (including no fault found)8,667
IBPoints failure (including no fault found)7,108
OCSignaller including mis-routing (not ERTM /ETCS related)4,925
VHPassenger Communication cord, door egress or emergency train alarm operated4,902
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure4,862
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)4,794
IRBroken/cracked/twisted/buckled/flawed rail4,443
TTLeaf fall Neutral4,010