Oxford
3,182 delay minutes
The biggest share (18%) of the delay picked up at Oxford in the four weeks to 9 December 2023 came from signal, points and power faults.
75% of these minutes were knock-on from something that happened elsewhere first. 92% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 294 | 9% | 8% | 11 a day, more than 3 of the other 4 years | 14 |
| Signals, points and power | 576 | 18% | 16% | 21 a day, the most in 5 years | 17 |
| Weather and structures | 206 | 6% | 7% | 7 a day, more than 3 of the other 4 years | - |
| Autumn | 14 | <1% | 7% | 1 a day, the least in 5 years | 1 |
| External | 19 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 536 | 17% | 17% | 19 a day, more than 2 of the other 4 years | 160 |
| The operators' causes | |||||
| Train faults | 562 | 18% | 16% | 20 a day, more than 3 of the other 4 years | 36 |
| Traincrew | 515 | 16% | 11% | 18 a day, the most in 5 years | 25 |
| Stations | 100 | 3% | 3% | 4 a day, more than 3 of the other 4 years | - |
| Operations | 56 | 2% | 5% | 2 a day, more than 1 of the other 4 years | 2 |
| Operator, other | 305 | 10% | 7% | 11 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 429 |
| IA | Signal failure (including no fault found) | 307 |
| VZ | Other passenger or external causes the responsibility of TOC | 189 |
| OU | Delays not Investigated by Network Rail | 180 |
| MD | Technical failures below the solebar | 156 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 155 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 148 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 139 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 86 |
| IB | Points failure (including no fault found) | 65 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 9,513 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,041 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 6,944 |
| MD | Technical failures below the solebar | 6,911 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 5,534 |
| J3 | Axle Counter Failure | 5,447 |
| IB | Points failure (including no fault found) | 4,753 |
| M8 | Technical failures above the Solebar | 4,602 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 3,223 |